BUILDING SERVICES 1

PROJECT 1:

In a group of between 5 to 6 students in the same tutorial group.
We were required to choose a building which was at least 4-storey high which can be either public or commercial buildings (i.e. office blocks, institutional buildings, shopping malls, etc.).We were to perform a thorough study and analysis of the following services systems associated to the building; i) mechanical ventilation and air-conditioning system, ii) electrical supply system, iii), mechanical transportation system as well as iv) fire protection system and document our findings accordingly.


The requirements of the project are as follows.
 Identify all the required building services components installed in the building.
 Perform a thorough study on all the services systems;
i) mechanical ventilation and air conditioning system,
ii) electrical supply system,
iii) mechanical transportation system, and
iv) fire protection system
 Obtain estimate dimensions and sizes of the spaces required for all the equipment and plant rooms identified.
 Provide brief explanation on how the building services components function. This explanation shall be in qualitative form and therefore no calculation is required.
 Summarize the systems in diagrammatic form.

REFLECTIONS:

This assignment helped me research each of the systems in depth.
I learnt to produce my work with clarity in terms of visual images.
There was production of quality  drawings and diagrams including appropriate drawing standards and conventions.

REPORT

http://www.slideshare.net/yassyed31/building-services-2-43650139





PROJECT 2:Building Services in a retreat house




Comments

Popular posts from this blog

SHAPE GRAMMAR

MEASURED DRAWINGS-KUALA LUMPUR TEXTILE MUSEUM

ISLAMIC ARCHITECTURE